Anerley
Date:
01/01/2012
Budget:
£178k
Duration:
3 months
This 2012 Anerley project showcases O’Sullivan Civil Engineering’s expertise in commercial groundwork for healthcare facilities. Completed within a three-month timeframe and £178,000 budget, we delivered comprehensive foundation works for a new Care Centre.
Our scope included systematic excavation for ground beam foundations and complete drainage installation, professional void former installation preventing future ground movement issues, comprehensive steel reinforcement fixing ensuring structural performance, precision concrete placement for floor slabs, and expert power floating creating high-quality level surfaces essential for healthcare environments.
The finished groundwork provided robust, long-lasting foundations for this important community care facility in Anerley

Ground beam excavation and drainage trench preparation for new Care Centre groundwork project in Anerley 
Systematic excavation works for ground beam foundations and drainage infrastructure at Care Centre development in Anerley 
Foundation excavation and drainage installation for healthcare facility groundwork completed over three months 
Comprehensive void former system with steel reinforcement mesh preparation for concrete floor slab at new Care Centre 
Concrete placement to floor slab with void formers and reinforcement for new healthcare facility in Anerley 
Professional power floating operations creating smooth, level floor surface for Care Centre groundwork completion 
Ground beam excavation and drainage trench preparation for new Care Centre groundwork project in Anerley