Victoria Hall
Date:
01/01/2012
Budget:
£439k
The Victoria Hall adult education centre project, completed in 2012 with a £439,000 budget, exemplifies O’Sullivan Civil Engineering’s expertise in public sector and educational facility construction. This comprehensive project created basement and ground floor accommodation for community adult education, requiring quality construction meeting public building standards.
Our scope included sheet piling installation forming secure site perimeter retention, complete drainage infrastructure installation, systematic basement excavation operations, extensive steel reinforcement fixing across all structural elements, sectional concrete placement to floor slabs, wall kicker and formwork construction, reinforced concrete wall casting, and progressive RC frame construction reaching first floor level. This project demonstrates our proven track record delivering essential community facilities to budget and specification.

Steel reinforcement installation for basement construction at Victoria Hall adult education centre 
Sectional concrete placement to basement floor slab at Victoria Hall educational facility construction 
Wall kicker construction for basement walls at Victoria Hall adult education centre project 
Progressive concrete placement to basement slab sections at Victoria Hall public sector construction project 
Precision wall formwork construction for basement at Victoria Hall adult education centre development 
Completed reinforced concrete basement walls at Victoria Hall educational facility construction 
Finished RC walls for basement construction at Victoria Hall adult education centre 
Reinforced concrete frame construction to first floor level at Victoria Hall educational building project 
Progressive RC frame build for adult education centre at Victoria Hall public sector project 
Aerial overview of Victoria Hall basement and RC frame construction from tower crane perspective