ABC Cinema
Date:
20120101
Budget:
2.6m
Duration:
10 months
Construction of piled foundations; installation of steel sheet piling; basement for a swimming pool and leisure complex; 6 storey concrete frame for a residential development. Retention of the front of the original building.

Excavation of site with retention of the front of the original building. 
Excavation of basement. 
Construction of pile caps and ground beams. 
Construction of pile caps and ground beams. 
Construction of pile caps and ground beams. 
Construction of pile caps and ground beams. 
Fixing reinforcement. 
Concrete to ground beams, pile caps and ground floor slab. 
Concrete to ground beams, pile caps and ground floor slab. 
RC frame construction. 
RC frame construction. 
RC frame construction. 
RC frame construction. 
RC frame construction. 
RC frame construction. 
RC frame construction. 
RC frame construction. 
One of the lads sitting down on the job! 
RC frame construction. 
RC frame construction. 
RC frame construction. 
Flying formwork table. 
Flying formwork table. 
Flying formwork table. 
RC frame. 
RC frame. 
RC frame. 
MINOLTA DIGITAL CAMERA 
Excavation of pile caps.