Chessington
Date:
01/01/2015
Client:
Manor Park Developments
O’Sullivan Civil Engineering completed full civil engineering and structural works for this three-storey commercial development in Chessington for Manor Park Developments. The project required specialist piling foundations to address ground conditions, followed by reinforced concrete ground beams creating a robust load-bearing platform. Our experienced team then constructed the complete three-storey RC frame structure, demonstrating our end-to-end capability in delivering complex foundation and superstructure projects. This integrated approach ensured seamless coordination between groundwork and frame construction phases, delivering efficiency and quality throughout

Piling foundation installation for three-storey concrete frame development in Chessington for Manor Park Developments 
Ground beam foundations and piling works providing structural support for multi-storey concrete frame construction 
Reinforced concrete ground beams connecting piled foundations at Chessington construction site 
Deep pile foundation system and groundwork preparation for commercial concrete frame building in Chessington 
Foundation and groundwork phase showing piling and ground beam installation for three-storey development 
Three-storey reinforced concrete frame construction rising from piled foundations in Chessington 
Multi-level RC frame structure built on engineered piling and ground beam foundation system